Complete design and build of a new data centre
CMA-CGM is the world's 3rd biggest privately owned shipping company. Their requirement was a complete design and build of a new data centre for their new UK corporate building, located adjacent to the River Mersey.


Comprehensive solution for new data centre
The solution comprised of a fire rated and gas sealed room, a shut down system in the event of a fire - to protect the equipment - a water detection system, an early warning fire detection system, a gas extraction system to vent the room in the event of fire suppressant being released, a complete power installation and distribution system (down to data cabinet level) including a UPS, an Argonite fire suppression system, down draft air-conditioning, a raised floor and a cabling infrastructure throughout the building linking to a Medusa II patching frame.
Jonathan Mason, Group IT Manager, remarked, "We were very impressed with the design service offered by Comms Room Services. It covered every aspect to the build and took into account detail that we had not previously considered. The build was carried out and project managed in a seamless manner and as a result required little input from ourselves. The finished solution exactly fitted our requirements, we are extremely pleased with the high quality of the finish."